07 Construction log

June 2025

Facade installation is underway on the north elevation of the stairwell A building. On the stairwell B building, works are being carried out on the installation of the east and west facades. In parallel, the facade is being continued on the eastern side, while on the northern and southern sides, the facade on the 16th–16A floors is nearing completion.
On the stairwell B building, additional roofing layers are being installed, while on the roof of stairwell A, mechanical ventilation and air-conditioning systems are being assembled.
Plastering and flooring works are in progress on the 14th and 15th floors of stairwell B. 14. In stairwell A, finishing works are underway in the corridors, including the painting of ceilings in common areas. Partition walls are being constructed on the 11th, 12th, and 13th floors of stairwell B and on the 8th and 9th floors of stairwell A. 12. At the same time, landscaping with greenery planting is being carried out around the stairwells, 8. along with the installation of terrace decking on the stairwell B building.

The Upper House
Go to top Contact
form